|
Historical Data
1972-1977: Airport construction (air terminal area 8,000m2, 9 aircraft stands)
1996: New V.O.R. installation
1996-1998: Air Terminal extension works (reaching 20,750 m2) and 900m taxiway
extension (overall length: 3,260m)
2000: Installation and operation of Radar
2006: Part of new terminal's extension handover to airport authorities
2007: Final air terminal extension handover (new departures terminal total area:
28,400 m2)
|
|
|
©
Παναγιώτης Πιέτρης |
|
|
|